We review the asset, location, access, existing condition, drawings and any coating specification. A site inspection or photos help define the work and identify constraints.
From quote and methodology to preparation, CIP inspection, coating and closeout, each stage has a defined purpose. The final sequence follows the contract, substrate and coating specification.
Discuss a projectWe establish what will be prepared, the required finish, who provides access and protection, and what testing or reporting the client needs. On specified coating projects, the methodology and ITP turn those requirements into an agreed sequence of checks and hold points.
We review the asset, location, access, existing condition, drawings and any coating specification. A site inspection or photos help define the work and identify constraints.
We set out the proposed preparation method, coating system or finish, inclusions, access, containment, cleanup limits and assumptions in a project-specific quote.
For specified work we prepare a methodology and Safe Work Method Statement, then agree an Inspection and Test Plan with the client. The ITP identifies checks, acceptance criteria, records and hold or witness points.
Before work starts, we confirm site access, isolate the work area as agreed, protect adjacent assets and establish the containment and recovery controls appropriate to the site.
The team checks the substrate, abrasive and equipment. For coating work, specified ambient readings and condensation risk are recorded before preparation or application proceeds.
We blast, wet blast or use power tools to the agreed target. On steel, visual cleanliness and surface profile are checked against the coating specification; decorative surfaces are compared with the agreed sample.
Where included in the ITP, AMPP Coating Inspector Program (CIP) inspectors verify preparation and documented hold points before coating. Any area that does not meet the agreed criteria is addressed and rechecked.
The specified primer, intermediate and finish coats are applied within the manufacturer’s conditions and recoat windows. Edges, welds and corners receive stripe coating where required; wet film thickness is monitored during application.
After cure, agreed visual and dry film thickness checks are completed. We close out records, address defects within scope, demobilise and hand over the inspection package required by the project.
Typical checks may include abrasive condition, visual cleanliness, surface profile by replica tape, substrate temperature, relative humidity, dew point, stripe coat verification and wet and dry film thickness.
Hold and witness points, acceptance limits and test frequency are agreed before production. AMPP CIP inspectors can support inspection and reporting where included in the scope. Additional tests, such as adhesion or holiday detection, are performed only when specified and appropriate for the coating system.
Relevant references can include AS 1627.4, AS/NZS 2312.1, relevant parts of AS/NZS 3894, ISO 8502-4 and ISO 8503-5.